073, deck caulking project. Foc'sle tent under
construction
. |
074, starboard foc'sle roller
fairlead base constructed and primed. Awaiting re-assembly of the
components. |
076, Deck Caulking, aft enclosure under
construction
. |
|
 |
 |
 |
|
092, Foc'sle tented and ready for caulking to
start. |
094, New timber inserted on the Aft deck. |
095, two new pieces of planking inserted Aft. |
|
 |
 |
 |
|
096, Aft enclosure. |
097, the enclosure erected on the Aft Deck to
provide weather protection during the re-caulking. |
100, the Foc'sle enclosure. |
|
 |
 |
 |
|
114, routing out the
deck seams on the foc'sle |
115, seams masked up
ready for the caulking material |
116, close up view of a
seam. The yellow is a membrane that the caulking material is applied
onto |
|
 |
 |
 |
|
124, applying the Sikoflex
caulking with a compressed air gun |
455, port deck winch being
rebuilt |
049, the starboard deck
winch before rebuild. |
|
 |
 |
 |
|
068, port deck winch
rebuilt |
149 The new
derrick arm is swung into place, ready for painting and load testing.
|
150 A detail
view of the end of the derrick arm showing the lifting eyes and
slewing guide eyes, which were welded on using a coded welder.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|