Bunker Lines Tanks Out on Deck Chain Locker Water & Heads

[Under Construction]

     
  Click on any picture to view larger image, use back button to close  

This picture Copyright© Graham Mackenzie & SSPL

This picture Copyright© Graham Mackenzie & SSPL

This picture Copyright© Graham Mackenzie & SSPL

117, shows the corrosion on one of the chain locker vertical stiffeners 119, another of the stiffeners with corrosion 128, chain locker doubler plate in position and being welded in place

This picture Copyright© Graham Mackenzie & SSPL

This picture Copyright© Graham Mackenzie & SSPL

This picture Copyright© Ian Bowman & SSPL

136, chain locker doublers and stiffeners welded in place 139, chain locker doublers painted with primer. 0534  Lowering the paint into the for'd ballast tank to repair the paint damaged by welding the doublers in the chain locker

This picture Copyright© Ian Bowman & SSPL

   
0547 the coating on the inside of one of the water tanks. This is an epoxy based system that had a primer, one base coat and one top coat.

 

   
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     

 

This page Copyright© Solent Steam Packet Ltd  2006-2007

Send mail to webmaster@ss-shieldhall.co.uk with questions or comments about this web site.
Last modified: 24 May, 2007

This page Copyright© Solent Steam Packet Ltd 2001- 2007

Send mail to webmaster@ss-shieldhall.co.uk with questions or comments about this web site.
Last modified:
16 October, 2007